![]() ![]() Motorists can expect a one lane closure with pilot car. Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475 Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938 NMDOT Project Manager- Brian Torres 57. Be aware of multiple construction operations taking place throughout the construction corridor. Expected completion date is to be determined at a future date. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. A WIDTH RESTRICTION of Twelve Feet (12') is in place. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving. Updates on this project will be posted on the New Mexico Department of Transportation’s road advisory website. Motorists can expect delays during this time.Ärivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. ![]() The contractor will be working Monday through Friday from 7:00 a.m. There will be an 11-foot width restriction in place as well. Starting May 1, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. This project will consist of full-depth reclamation, removal of existing asphalt, placement of new asphalt pavement, safety enhancements, traffic control, signing and striping. 550 between mile markers 161 and 165 in Aztec N.M. will begin a roadway improvement project on U.S. Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) and Fisher Sand & Gravel Inc. Title: Lane Closure, US 550 northbound and southbound from mile marker 160, Aztec to mile marker 165, 1 mile south of Inca. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475 Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938 NMDOT Project Manager- Juan Salas 57 Post Date: 08:38:54.0 Update Date: 08:48:15.0 Expiration Date: unknown Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 22, 1 mile north of Loving. Motorists are advised to use caution, obey posted speed limits, expect delays and plan accordingly. One lane will be closed during non-peak hours, with all lanes leading into the Santa Fe area remaining open until 9 a.m., and all lanes leading out of the Santa Fe area reopening before 4 p.m. ![]() to 6 p.m., 6 days a week weather permitting. The 13-mile project is expected to last 20 working days and will include new pavement and striping. Work will take place on I 25 in both directions from mile marker 277 (South of Cerrillos Rd.) to 290 (South of El Dorado). will begin a pavement rehabilitation project on Monday, June 12th., in the Santa Fe area. Description: Roadwork~~~The New Mexico Department of Transportation along with Brasier Asphalt Inc. Title: Roadwork, I 25 northbound and southbound from mile marker 277, 1 mile south of Santa Fe to mile marker 290, (US 285). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |